High-Tech

Introduction of High-Tech Business

JINSUNG ENG Co., Ltd. enhanced the expertise of high-tech business based on the cutting-edge production business place by establishing the clean room.

The GAS supply system with super high purity used for the process of manufacturing semi-conductors is an essential element, and since it contacts with special air/fluid affecting absolutely the defect ratio of products depending on the level of purity, it is essential to be ultra clean with high purity. Products are manufactured and constructed with efficient design according to purposes of works such as specification of constant indoor temperature/humidity, specification of a darkroom, manufacturing medicine, semi-conductor industry, electronic parts, optical industry and aviation industry etc. by maintaining the class of the cleanliness level at its own clean room.

  • Hi-Tech Piping
  • Hi-Tech Piping
  • PFA TUBE
  • PFA TUBE
  • Business Performance
  • Samsung Electronics P2-PJT Greendong wastewater treatment plant Piping
  • Samsung Display Asan SDC a detour GAS&PCW Piping
  • Samsung E-PJT GAS & PCW 2 Tool Mechanical Piping (In Progress)
  • Samsung E-PJT CHEMICAL Piping (In Progress)
  • Samsung Electronics Pyeongtaek EUV GAS & PCW Machine Piping (In Progress)
  • Samsung Electronics Pyeongtaek FAB Phase2 CHEMICAL 1 Tool Piping (In Progress)
  • Samsung Electronics Pyeongtaek FAB Phase2 GAS & PCW 2 Tool Machine Piping (In Progress)
  • Samsung Display Asan DC 2nd GAS & PCW Machine Piping (In Progress)
  • Samsung Electronics Pyeongtaek FAB the frostbite area the western deadline GAS & PCW 2 Tool
  • Samsung Electronics Pyeongtaek FAB the upper east deadline CHEMICAL Piping
  • Samsung Electronics Pyeongtaek FAB the upper west CHMICAL Piping
  • Samsung Electronics MR2 Lower FAB UTILITY Mechanical Piping
  • Samsung Display Asan 1 Waterproof Drainage Pump New Installation and duplexing Work
  • Samsung Display 7,8 Lines Waste Water Improvement Project
  • Business Performance
  • Samsung Display 8L TI0CU Construction for Converted Investment
  • Samsung Display A2 YOUM 20K GAS&PCW Mechanical Piping
  • Samsung Display A3 K-PJT FAB 4 2nd Mechanical Piping
  • Samsung Display K-PJT FAB3, FAB4 Mist Fog System Installation
  • Samsung Display K-PJT FAB3, FAB4 Crean Room Mechanical Piping
  • Samsung Display A3 K-PJT 30K 2nd Mechanical Piping
  • Samsung Display 2-1 Step Bioreactor air diffuser replacement
  • Samsung Display A3 YOUM 15K 2nd Hook-up Mechanical Piping
  • Samsung Display 16’ Annual Contract 2nd Mechanical Piping Hook-up
  • Samsung Display K-Prpject Crean Room Mechanical Piping
  • Samsung Display T7-PJT GAS & PCW Mechanical Piping
  • Samsung Display Asan DC 1nd GAS & PCW Mechanical Piping
  • Samsung Display K-PJT Cell FAB & 120K Clean Room Mechanical Piping
  • Samsung Electronics 17Line S3 P2 CHEMICAL Piping
  • Business Performance
  • SK Hynix 2018 1Q M14 Ph-2B Hook-up Mechanical Piping
  • SK Hynix 2017 1~3Q M14 Hook-up Mechanical Piping
  • SK Hynix 2016 1~2Q M11,M12 Hook-up Mechanical Piping
  • SK Hynix 2016 1~4Q M14 Hook-up Mechanical Piping
  • SK Hynix M14 Ph-1 Side Fab Construction PJT UT Mechanical Piping
  • SK Hynix M14 Ph-2B W/T PCW, NPW Mechanical Piping
  • SK Hynix 1~4Q M14 Hook-up Mechanical Piping
  • SK Hynix 1~2Q M11,M12 Hook-up Mechanical Piping
  • SK Hynix M14 Phase-2 PJT 中 PCW Mechanical Piping
  • SK Hynix M14 2Q~4Q Invested Equipment Piping Hook-up
  • SK Hynix M14 Phase-1 PJT PCW System Mechanical Piping
  • SK Hynix M7 A-Line Project (PCW System & FAB Utility)
위로